Alder Recreation Centre — Pool Replacement
Orangeville, Ontario
The scope of this project involved the complete re-construction of the 2002 design-built indoor pools. The new lap pool features a stainless steel pool tank. The new leisure pool and play features have been re-configured to allow various teaching and play zones.
Project completed in spring 2024. GWAI was architectural consultant to DEI Consulting Engineers.